Back to all news
Web3

Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW

Crypto Briefing·July 20, 2026·1 min read
Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW

Hut 8 signed a $9.8 billion second lease at Beacon Point, doubling the Texas AI campus to 704MW. Total contracted capacity reaches 949MW. This expansion positions Hut 8 as a major player in AI infrastructure, leveraging its crypto mining expertise for high-performance computing.

Read at Crypto Briefing
Daily crypto arcade

Read the news, then play it.

Chainshorts turns crypto headlines into a daily game. Catch up in 60 words, then jump into daily lucky draws for a shot at the pot.

Open ChainshortsGet it on the Solana dApp Store